Whether you’re updating your old bathtub to a walk-in shower for style, safety, or convenience, one of the first questions homeowners ask is: “How long does a shower conversion really take?”
The idea of tearing out a tub and remodeling part of your bathroom can feel overwhelming—especially if you’re worried about being without a functional bathroom for weeks. The good news? Most professional shower conversions can be completed much faster than you might expect, especially when handled by experienced installers like Five Star Bath Solutions.
In this blog, we’ll walk you through:
- What affects the timeline of a shower conversion
- A day-by-day breakdown of the average process
- What delays to expect (and how to avoid them)
- How long you’ll be without your bathroom
- Why choosing the right contractor makes all the difference
What Is a Shower Conversion?
A shower conversion typically involves removing a traditional bathtub and replacing it with a walk-in shower. These upgrades are popular with homeowners looking for:
- Easier access (especially seniors or those with mobility needs)
- A modern, updated bathroom look
- Better space efficiency in smaller bathrooms
- A practical alternative to underused tubs
Conversions can range from simple and fast (swapping a tub for a pre-made shower insert) to more complex (custom tile work, moving plumbing, and adding glass enclosures).
The Typical Shower Conversion Timeline
The time it takes to complete a shower conversion depends on several factors:
- The scope of work
- The materials being used
- The condition of the existing plumbing or walls
- Whether permits are required
- Your contractor’s experience and team size
However, a typical tub-to-shower conversion with a professional installer generally falls into one of two categories:
1. 1–2 Days: Fast Install with Custom-Fit Acrylic System
Five Star Bath Solutions specializes in these quick, efficient upgrades using custom-fit shower systems. Because the shower unit is measured, built offsite, and installed by trained pros, you can often have a brand-new walk-in shower in just one or two days.
2. 3–7 Days: Custom Tile or High-End Conversion
If you’re opting for tiled walls, moving plumbing, or building a full wet room, the project may take longer—up to a week or more—especially if multiple subcontractors (tile setters, plumbers, electricians) are involved.
Day-by-Day Breakdown: Fast Shower Conversions
Let’s say you’re going with a modern acrylic walk-in shower system, like the ones Five Star Bath Solutions installs throughout Central New Jersey. Here’s what a fast 2-day conversion typically looks like:
Before Installation: Design & Planning Phase
This part can take a few days to a couple of weeks, depending on how quickly materials are selected and available. It includes:
- In-home consultation
- Measuring your current tub space
- Selecting finishes (wall panels, hardware, doors, accessories)
- Ordering materials and setting the install date
This phase doesn’t impact your bathroom usage, but it’s essential for a smooth install.
Day 1: Demolition & Prep
- Remove existing bathtub
- Inspect walls, subfloor, and plumbing
- Repair or reinforce studs and surfaces as needed
- Update drain or valve fixtures if required
- Install moisture-resistant backer board
End of Day 1: The bathroom may be temporarily unusable, depending on plumbing and how extensive the prep work is.
Day 2: Installation
- Install shower base/pan
- Fit custom wall panels or tiles
- Seal edges and corners
- Install hardware, grab bars, fixtures, and shelving
- Mount shower door or curtain rod
- Final plumbing connections and tests
By the end of Day 2, your new walk-in shower is typically ready to use after sealants or adhesives have dried (usually 24 hours).
What Can Extend the Timeline?
While many conversions are fast, there are a few common situations that may extend your project timeline:
1. Plumbing Relocation
If you’re moving the shower drain, valve, or controls to a new wall, a plumber will be needed to reroute lines. This can add 1–2 days, depending on complexity.
2. Custom Tile Work
Tile showers look beautiful but take more time due to cutting, setting, and grouting. This can extend the install to 3–5 days on average.
3. Structural Repairs
If your contractor finds mold, water damage, or rot behind the walls (common in older bathrooms), repairs may need to be made before new materials can be installed. This adds time and cost, but ensures safety and longevity.
How Long Will I Be Without a Bathroom?
For most homeowners, the biggest concern is not just how long the project takes—but how long their bathroom is out of commission.
With a fast acrylic shower system:
- You may only lose access to your shower for 1–2 days
- Toilet and sink use may remain unaffected
- If multiple bathrooms exist in your home, disruption is minimal
If you have only one bathroom, plan ahead:
- Arrange to shower at a friend or family member’s home
- Consider scheduling the install when you can take time off or stay elsewhere
How to Keep the Project on Schedule
To avoid delays or surprises, here’s how to keep your shower conversion moving smoothly:
- Hire an Experienced Specialist
Choose a contractor like Five Star Bath Solutions who specializes in bathroom conversions and knows how to avoid common setbacks. - Have a Clear Design Plan
Select your materials and fixtures before the install begins. Last-minute changes can delay shipments or affect install time. - Be Transparent About Your Schedule
Let your contractor know if you have time constraints—like needing the bathroom ready for guests or an event. - Prepare the Area
Clear out the bathroom, remove personal items, and make sure the crew has access to the space before the first day.
Why Choose Five Star Bath Solutions?
At Five Star Bath Solutions of Central NJ, we focus exclusively on bath and shower remodeling—and we do it fast.
- Most shower conversions completed in 1–2 days
- Custom-fit systems for beautiful, durable results
- Accessible options like grab bars and walk-in shower pans
- Professional crews who respect your home and your time
- Service areas include Marlton, Burlington, Basking Ridge, Hamilton, and beyond
We’ve helped hundreds of New Jersey homeowners enjoy a smoother, safer, more stylish shower—with minimal disruption and maximum value.
Final Thoughts
So, how long does a shower conversion really take? In most cases, just 1–2 days with the right contractor and materials. Even more complex conversions rarely go beyond a week.
What matters most is planning, experience, and having a team that respects your schedule and your home. If you’re ready to ditch the tub and upgrade your space, Five Star Bath Solutions is here to make your transformation fast, simple, and stress-free.