A bathroom remodel is one of the most impactful upgrades you can make to your home. Whether it’s a simple shower update, a full tub-to-shower conversion, or a complete bath overhaul, a modernized bathroom can improve comfort, accessibility, and even your home’s resale value.
But one of the most common questions homeowners ask before starting a remodel is: “How long does it take to remodel a bathroom?” The answer isn’t one-size-fits-all. Timing depends on the scope of the work, the materials you choose, and the efficiency of your contractor. In this guide, we’ll break down everything you need to know about bathroom remodel timelines, from small upgrades to full renovations.
Factors That Affect Bathroom Remodel Timelines
The total time for a bathroom remodel depends on several key factors. Understanding these will help you set realistic expectations and plan accordingly.
1. Project Scope
- Minor updates: Replacing fixtures, vanities, or countertops can often be completed in 1–3 days.
- Shower conversions or walk-in tubs: These are more complex than simple fixture replacements, typically taking 1–2 days for fast installs with custom-fit acrylic systems.
- Full bathroom remodels: Including tub removal, plumbing updates, tiling, and structural changes, these projects can take 1–2 weeks or longer depending on the complexity.
2. Material Selection
Your choices can have a major impact on timeline:
- Pre-fabricated shower panels or acrylic tubs are faster to install.
- Custom tile or stonework requires additional time for cutting, setting, and grouting.
- Special finishes, custom cabinetry, or imported fixtures may take extra time to arrive.
3. Existing Bathroom Condition
Older bathrooms may have hidden issues, such as:
- Water damage or mold behind walls
- Rotten subflooring
- Outdated plumbing or electrical systems
Repairing these problems adds extra time but is critical for a safe, lasting remodel.
4. Permits and Inspections
In New Jersey, most like-for-like bathroom updates—tub-to-shower, shower-to-shower, tub-to-walk-in tub, or tub-to-tub—don’t require permits. Only projects that involve moving the drain location will typically require a plumbing permit. If permits are needed, you should factor in time for application approval and inspections.
5. Contractor Scheduling and Crew Size
Experienced contractors with a full crew can complete projects faster. For example, a team specializing in bath and shower remodeling can often complete a shower conversion in 1–2 days, whereas a general contractor juggling multiple projects may take longer.
Typical Bathroom Remodel Timelines
Here’s a closer look at how long different types of bathroom remodels typically take:
1. Minor Bathroom Updates (1–3 Days)
Minor updates include:
- Replacing faucets or sinks
- Installing a new vanity or countertop
- Updating lighting fixtures
- Painting or resurfacing walls
Timeline Breakdown:
- Day 1: Remove old fixtures, paint, prep surfaces
- Day 2: Install new fixtures, lighting, or vanity
- Day 3 (optional): Final touches, sealing, and cleanup
Impact: Minimal disruption; most homeowners can still use the bathroom.
2. Shower Conversions or Walk-In Tub Installations (1–2 Days)
For homeowners replacing a bathtub with a walk-in tub or converting a tub to a shower, the timeline is surprisingly fast when using professional installers like Five Star Bath Solutions.
Day 1: Demolition and Prep
- Remove existing tub
- Inspect walls, subfloor, and plumbing
- Repair or reinforce areas as needed
- Install moisture-resistant backer boards
Day 2: Installation
- Fit shower or walk-in tub unit
- Seal edges and corners
- Install grab bars, fixtures, and hardware
- Connect plumbing and test for leaks
Note: If using custom tiles or making major plumbing adjustments (moving the drain), expect an additional 1–3 days.
3. Full Bathroom Remodels (1–2 Weeks or More)
A complete renovation may include:
- Demolition of the existing bathroom
- Moving or updating plumbing and electrical
- Installing new tub, shower, vanity, and cabinetry
- Tiling floors and walls
- Painting, sealing, and finishing touches
Day-by-Day Breakdown for a Typical 7-Day Remodel:
- Day 1–2: Demolition of old bathroom, prep subfloor and walls
- Day 3–4: Plumbing and electrical work
- Day 5: Install new tub, shower, or walk-in tub
- Day 6: Install vanity, cabinets, and fixtures
- Day 7: Flooring, wall finishes, sealing, and final touches
Factors That Can Extend the Timeline:
- Custom tile patterns or stonework
- Delayed fixture delivery
- Hidden water damage or mold remediation
- Permit requirements for drain relocation
How to Minimize Bathroom Remodel Delays
Even experienced contractors can run into unforeseen delays. Here’s how to help keep your remodel on schedule:
- Plan Ahead
Select materials, fixtures, and finishes before the project begins. Last-minute changes can slow down the process. - Hire a Specialist
Contractors like Five Star Bath Solutions focus exclusively on bathroom remodeling, meaning faster installs and fewer coordination issues. - Clear the Space
Remove personal items, towels, and toiletries so the crew can work efficiently. - Communicate Your Schedule
Let your contractor know if you have time constraints, especially if you only have one bathroom. - Address Hidden Issues Early
Inspect for water damage, mold, or outdated plumbing to prevent surprises mid-project.
How Long Will You Be Without a Bathroom?
Many homeowners worry about being without a functional bathroom. The timeline depends on the project type:
- Minor updates: Bathroom remains usable during the project
- Shower conversion or walk-in tub: Usually 1–2 days of limited access
- Full remodel: 1–2 weeks; consider using a secondary bathroom if available or planning a temporary alternative
Choosing a contractor who works efficiently and has experience with fast-track conversions can minimize disruption.
The Five Star Bath Solutions Advantage
At Five Star Bath Solutions, we specialize in bathroom and shower remodeling throughout Central New Jersey, including towns like Marlton, Trenton, Edison, and Piscataway. We help homeowners get the bathroom of their dreams without unnecessary delays:
- Fast installation: Most shower conversions are completed in 1–2 days
- Permit-smart: We handle permitting only when drain relocation is involved
- Safety-focused: Grab bars, low-threshold showers, and walk-in tubs available
- Customizable: Materials, finishes, and layouts tailored to your needs
- Experienced crews: Professionals who respect your home and schedule
By working with a team that specializes exclusively in bathrooms, you can enjoy faster remodels, minimal disruption, and high-quality results.
Final Thoughts
So, how long does it take to remodel a bathroom?
- Minor updates: 1–3 days
- Shower or walk-in tub conversions: 1–2 days
- Full remodels: 1–2 weeks or more, depending on complexity
Factors like material choices, project scope, hidden damage, and plumbing modifications affect the timeline. In New Jersey, the majority of bath and shower upgrades—like-for-like replacements and conversions—don’t require permits, meaning you can remodel faster and more efficiently.
By hiring a specialist like Five Star Bath Solutions, you can plan your remodel with confidence, knowing that your project will be fast, safe, and high-quality, with minimal disruption to your daily life.Ready to upgrade your bathroom? Contact Five Star Bath Solutions today to schedule your free consultation and see how quickly we can transform your space.